Build // Cloud

Cloud Migration Designed to Be Reversible at Every Step

Phased plans, parallel environments, and a documented rollback path at each wave. PDPL data residency is designed in from the first architecture session, when it costs nothing to accommodate.

Reference Architecture
IDENTITY
Entra IDMFAConditional access
WORKLOAD
Azure IaaSPaaSContainers
DATA
Residency controlsEncryptionBackup
PRODUCTIVITY
Microsoft 365TeamsSharePoint
Capabilities

What We Design and Build

Six capability areas. Most engagements combine three or four.

Cloud Migration

/ 01
Phased and reversible

Each workload is assessed for what it should become: rehost, refactor, or retire. Migration then runs in waves you can halt at any point.

Workload assessmentMigration wavesParallel runRollback playbooksCutover planningPost-migration validation

Azure Infrastructure

/ 02
Governed from day one

Landing zones, networking, and governance designed before deployment, so the estate stays auditable as it grows.

Landing zone designHub-spoke networkingIaaS and PaaSGovernance policyTagging and cost allocationInfrastructure as code

Microsoft 365 & Modern Workplace

/ 03
Deployed and hardened

The full stack from identity through productivity to security, with the tenant configured against a security baseline rather than shipped defaults.

Tenant deploymentIdentity hardeningTeams and SharePointData governanceRetention policySecurity baseline

Cloud Security & Posture

/ 04
Continuous

Workloads typically migrate faster than the controls protecting them. Posture management identifies drift in the week it occurs.

CSPMWorkload protectionContainer securityConditional accessPrivileged identityCompliance dashboards

Disaster Recovery as a Service

/ 05
Tested on schedule

An untested DR plan is documentation. We build it, then exercise it on a defined cadence and report the results.

RPO/RTO definitionReplication designFailover automationScheduled DR testingRunbook documentationTest evidence reporting

Cloud Cost Engineering

/ 06
At the architecture layer

Spend is decided at design time: right-sizing, reserved capacity, and workload placement. That is where we work on it.

Right-sizingReserved instancesWorkload placementIdle resource eliminationCost allocationMonthly optimization review
Delivery Model

Five Phases, and What You Get From Each

Each phase closes with a deliverable you own.

01
Week 1–2

Discover

Workload inventory, dependency mapping, and a direct assessment of which applications should not move at all.

You get: workload assessment and migration candidacy map
02
Week 2–4

Design

Landing zone, network topology, identity model, and data residency controls, approved before anything is provisioned.

You get: signed-off architecture and cost model
03
Week 4–6

Pilot

One workload migrated and running in parallel. Issues surface on something low-impact and are resolved before the wider estate moves.

You get: validated pilot with measured performance
04
Ongoing

Migrate

Wave by wave, each with a rollback path and a cutover window agreed against your operational calendar.

You get: phased migration, zero unplanned outage target
05
Close

Optimize & Handover

Cost tuning, as-built documentation, and your team trained on the platform.

You get: as-built docs, training, optimized spend
Platforms

What We Build On

Partnerships give our architects range and direct escalation paths. Your requirements determine the architecture.

Microsoft AzureCloud partner. Migration, landing zones, and governance.
Microsoft 365Tenant deployment, identity hardening, and security baseline.
VeeamBackup and replication for cloud and hybrid workloads.
FortinetCloud security, posture management, and workload protection.

ITBuilders holds no exclusive vendor agreements. Full partner roster on the partners page.

Case Pattern

What This Looks Like in Practice

Illustrative Pattern — Not a Client Engagement

Financial Services Group, Riyadh

The Problem

On-premise estate approaching end of life, PDPL position unclear, DR untested.

The Approach

Workload assessment retired 20% of the estate before anything moved. Landing zone with residency controls designed first. Pilot on a non-critical workload for three weeks.

The Outcome

Phased migration with no unplanned outage, DR exercised quarterly with evidence, cloud spend tracked per business unit.

This is a representative pattern showing how the delivery model works, not a specific client engagement. Real anonymized case studies are available under NDA after a scoping conversation.

FAQ

Questions We Get Asked

Which company delivers Microsoft Azure migration in Saudi Arabia?

ITBuilders, a Riyadh-based Microsoft cloud partner, delivering Azure and Microsoft 365 across the Kingdom with PDPL-aligned architecture.

Does moving to the cloud affect PDPL compliance?

Not where residency is designed in from the outset. The difficulty arises when residency requirements surface after migration.

Will our business go down during migration?

The target is zero unplanned outage: parallel environments, a rollback path at every wave, and cutover windows agreed against your calendar.

How long does a migration take?

Discovery through pilot typically runs six weeks. Total duration depends on workload count and complexity.

Can you reduce our existing cloud bill?

Usually, and the work happens at the architecture layer.

Assess Before You Commit

Book a cloud readiness review. We will identify which workloads should move, which should stay, and what each option costs.